Thursday, February 28, 2008
the new chassis
This is what it looks like after 2 weeks at the welder, and me painting for 2 days. This is behind the rear wheel and holdup the weight of the bathrom and the black water tank
Which if I can get it to stop leaking will hold 20 gallons .For those not in the know water weighs 8 lbs/gal.
Subscribe to:
Post Comments (Atom)
4 comments:
I don't understand what I'm looking at. What is all of that orange material on top?
PLYWOOD!!!!
Its the bottom of the floor that sits on the chassis .Doesn't look bad for 42 years
The black is a section of the frame after 3 coats of black paint .Its hard to get a panoramic view when you arelying on your back on a concrete floor
Hope to see every thing live. I think you made the right choice by driving down there to complete your project. You can't come home untill your finished.
Post a Comment